More flexibility in time tracking

More flexibility in time tracking and time registration for construction
Garmin navigation device with the text Flexible Time Tracking

Garmin and Suivo launch innovative solutions for time registration

Our own market research shows that many construction companies still work with slightly outdated time registration systems. This in itself is not a problem as long as they work, but these systems are often user-unfriendly and not at all flexible, which means that a lot of manual adjustments still have to be made by the administration, which costs time and therefore money. Moreover, the correct distribution of costs during the post calculation of projects is extremely complex.

Flexible and user-friendly

It can also be done differently. Garmin and Suivo offer construction companies flexible and user-friendly systems that replace the Dallas-key or LCD time registration systems and transform them into a central future-proof and open platform that grows with the needs of your company.

Time Tracking Tool

The collaboration combines Garmins’ hardware with the Suivo Track & Trace Blackbox so that a construction company has all the necessary construction Apps available for their teams without having to develop a custom application. The Garmin hardware can be used in or out of the vehicle giving your team leaders greater flexibility on site. A simple time tracking tool becomes a:

The combinations are only limited by the availability of apps.

‍

Reduce administrative hassle and get more out of your time tracking system?

Discover more!

‍

Free guide

Make Every Hour Count

A practical guide to digital time registration for teams that work off-site, across sites or on the road.

Download the guideSee workforce solutions →

Cool stuff

Construction crew finishing a concrete floor on a Belgian building site on a summer evening

23/11/2026

Construction overtime in Belgium: the KB 213 rules for 130 and 180 hours

Service technician unloading tools from a van at a customer's house early in the morning

18/11/2026

Flexitime in Belgium: the rules, the registration and a worked week

Field technician loading tools into a van at a building site at the end of a long working day

13/11/2026

Overtime in Belgium: limits, pay and recovery rest, with a worked month