Axel De Soomer - Suivo

Axel De Soomer

Marketing manager

Time Registration for the Concrete Sector: App, Badge or Site Pole?

Choosing the right time registration method for the Belgian concrete sector depends on your site type, workforce composition, and integration requirements: QR code check-in suits fixed-location concrete plants with stable workforces, while GPS-based registration works for mobile delivery crews and multi-site operations where workers move between locations daily.

Read More »

How Hoogmartens Saves 1 Hour per Day with Digital Time Registration

Hoogmartens Construction reduced their daily payroll administration by one hour per site manager after implementing Suivo’s digital time registration — the CIAW integration eliminated manual government reporting, and the direct export to their payroll provider removed the transcription step that had been causing recurring errors.

Read More »

What Is the Difference Between CIAW and Time Registration in Construction?

CIAW (Check in at Work) and time registration are often confused, but they serve different purposes on Belgian construction sites: CIAW is the government attendance registration system that records who is present at a worksite, while time registration tracks actual hours worked for payroll and project costing — both are mandatory, and both must be managed simultaneously.

Read More »

Time Registration for Concrete Plants: Why It Goes Beyond Compliance

Time registration in construction is about far more than legal compliance for concrete plants: it creates a verifiable record that protects main contractors under Belgian chain liability law, enables accurate payroll processing, and provides the operational data needed to manage subcontractor costs on complex multi-phase sites.

Read More »

Time Registration for Construction: Pricing and Cost per Employee

The cost of time registration for construction varies widely — from basic CIAW-compliant apps at a few euros per worker to full workforce management platforms with hardware, integrations, and dedicated support. This transparent pricing guide breaks down hardware costs, software licences, setup fees, and typical total cost per employee so Belgian construction companies can build a realistic budget for 2026 and compare options against their actual site requirements.

Read More »

How to Choose a Time Registration System for Construction Sites

Choosing a time registration system for Belgian construction goes beyond clocking in and out: the right platform needs to handle CIAW compliance, subcontractor coverage across multiple sites, payroll export to your social secretariat, and audit-ready records — without adding friction for workers in the field. This guide gives you 8 practical criteria to evaluate any system against your real operational requirements, not just a marketing feature checklist.

Read More »

Time Registration Software for Construction: Features That Actually Matter

Most time registration software was not built for Belgian construction sites — and the gap shows when you need CIAW-compliant check-ins, multi-site subcontractor registration, CLA rule enforcement, and payroll export that actually works with your HR system. This buyer’s guide cuts through the noise and explains which features separate a field-ready, compliant platform from a basic time-tracking app — and which capabilities prevent the most common audit failures.

Read More »

CIAW for Ready-Mix Concrete: Thresholds and Registration Obligations

Ready-mix concrete deliveries trigger CIAW registration obligations only when the total construction work on a site exceeds specific legal thresholds — but the rules around which deliveries count, and when truck drivers must register separately, create real compliance uncertainty for dispatchers and fleet managers. This guide sets out the exact thresholds, the exemptions that apply, and the fastest compliant registration method for high-volume ready-mix operations.

Read More »

CIAW in the Concrete Sector: When Is It Mandatory and How to Register?

CIAW registration is mandatory in the concrete sector when work qualifies as ‘real estate work’ under Belgian law — but not every pour, delivery, or finishing job meets that threshold, and the distinction regularly catches companies off guard during social inspections. This guide clarifies when CIAW applies to concrete operations, how to register correctly for different work types, and what fines and liability risks arise when registrations are incomplete or missing.

Read More »

Future-proofing your company?

Then innovate! Download the e-booklet to find out how!